⬡PhaseSpace

Reservoir lab

Watch the water arrive

A two-phase waterflood on a five-spot pattern, simulated on the engine rather than animated. Column height and colour are both water saturation, anchored at connate water and residual oil so two moments are directly comparable. The front position is checked against the Buckley–Leverett closed form to about 1%, and water is conserved to machine precision, both on every commit.

What should we do about it

A connectivity fit picks the shortlist; every plan on it is then run through the full simulator. The ranking is by simulated NPV, never by the screening model's own estimate.

Eight plans — shut-ins, injection rebalancing, lower injection and the combinations — each one fully simulated for eight years, then ranked. Takes about six seconds.

The case

Four injectors around one producer. Change anything and run it again.